
Netherlands – night closures of the Van Brienenoord bridge in Rotterdam
The Van Brienenoord bridge is 1,320 meters long and is one of the largest arch bridges in Europe. Every day, 230,000 vehicles pass through it.
The bridge will be completely closed during two nights: Monday, August 28, from 10:00 PM to 5:00 AM and on Tuesday, August 29, from 10:00 PM to 5:00 AM. The closure is necessary to conduct renovation work. Both the main and parallel lanes of the A16 from the Ridderster Junction to Van Brienenoord Bridge will be closed.
Diversion routes
❗ Transit traffic will be diverted through the Rotterdam ring road (Benelux tunnel) and the A20, A4 and A15 motorways. The diversion route is marked with yellow and numbered signs above and along the road.
Latest Posts
Slovakia: Disruptions on the D3 – Horelica Tunnel Closure and Detours via Čadca
From June 29 to August 31 this year, drivers should expect major traffic disruptions in northern Slovakia. Due to expansion joint repairs in the D3 Horelica...
Closure of the D8 Motorway in the Czech Republic: Detours and Restrictions for Trucks Over 7.5 Tons
From July 2 to July 8, 2025, drivers traveling on the D8 motorway in northern Czechia should prepare for significant disruptions. When planning a trip...
Austria Extends Border Controls with Slovenia and Hungary Until November 2025
In accordance with the amendment to the regulation issued by the Austrian Federal Minister of the Interior, temporary border controls at the borders with...